HSAP Sdn. Bhd.
"Setting the Pace, Conquering Success"
Photographs of Projects
FABRICATION WORKS
DESIGN AND FABRICATE MARKER FOR CARIGALI

FABRICATION OF BURNER'S HEAD (SCHLUMBERGER)
DESIGN AND FABRICATE MARKER FOR CARIGALI
TANK FABRICATION AND MAINTENANCE
DESIGN, CONSTRUCT AND COMMISSIONING OF TANK FARM 17, 18, 19 (PS TERMINAL - TAWAU)

JACK UP TANK /MAINTENANCE FOR SHELL TIMUR LABUAN
DESIGN, CONSTRUCT AND COMMISSIONING OF TANK FARM 17, 18, 19 (PS TERMINAL - TAWAU)
CIVIL CONSTRUCTION
TANK FOOTING FOR TANK 15 & 16 (PCSB)
TANK FOOTING FOR TANK 15 & 16 (PCSB)
MECHANICAL PIPING AND MAINTENANCE

PIPELINE INSTALLATION (PETRONAS DEPOT)

FABRICATION AND MECHANICAL PIPING OF CARGO AND DELIVERY LINE FOR TAWAU DEPOT
PIPELINE MAINTENANCE (LCOT)

PIPELINE INSTALLATION (PETRONAS DEPOT)
SHORE APPROACH

ROCK BERM AND COFFERDAM CONSTRUCTION
GUMUSUT KAKAP BEACH PULL

ROCK BERM AND COFFERDAM CONSTRUCTION
POST TRENCHING

POST TRENCHING WEST LUTONG 18" & 24" PIPELINE BURIAL

HSAP SEA TRRENCHER (OWN DESIGN)

LGAST POST TRENCHING PREPARATION OF TRANSFER PUMP

POST TRENCHING WEST LUTONG 18" & 24" PIPELINE BURIAL
POST TRENCPIPELINE MISALIGNMENT RECTIFICATION WORKS AT SOGTHING

FIT UP WORK OF PIPELINE

MPI AND UT LAMINATION CHECK FOR 28” BEND PIPE AND UNDERGROUND PIPE

MPI AND UT LAMINATION CHECK FOR 28” BEND PIPE AND UNDERGROUND PIPE

FIT UP WORK OF PIPELINE
24” DIA. ANDRA / T-COT PIPELINE
ROCK LAYER PROTECTION PROJECT
![]() Untitled | ![]() Untitled |
---|
B-COT PIPELINE ROCK LAYER PROTECTION PROJECT
![]() Untitled | ![]() Untitled |
---|
KUMANG PIPELINE PROTECTION PROJECT

COMMENCEMENT OF OFFSHORE ROCK DUMPING (PIPELINE PROTECTION) WORK

CHUTE INSTALLATION

BARGE ANCHOR DEPLOYMENT

COMMENCEMENT OF OFFSHORE ROCK DUMPING (PIPELINE PROTECTION) WORK
28” DIA. EVA-NMB GAS DELIVERY SYSTEM (ENGDS) PIPELINE PROTECTION WORKS
![]() | ![]() |
---|---|
![]() |
PULAU GAYA PIPELINE INSTALLATION
![]() | ![]() |
---|---|
![]() | ![]() |
VINCI PROJECTS – REMOVAL OF SHEET PILE
![]() | ![]() |
---|---|
![]() | ![]() |
ECA-EN RANGING & DEPERMING SYSTEM INSTALLATION
![]() | ![]() |
---|---|
![]() |
EPCC of CHEVRON’S PRAI TERMINAL - FENDER REPLACEMENT PROJECT
EPCC of CHEVRON’S PRAI TERMINAL - FENDER REPLACEMENT PROJECT
![]() FENDERS JOINT INSPECTION WITH CHEVRO | ![]() FENDERS JOINT INSPECTION WITH CHEVRO |
---|---|
![]() INSTALLATION OF FENDERS AND TOUCH UP | ![]() INSTALLATION OF FENDERS AND TOUCH UP |
![]() REMOVAL OF OLD FENDERS (NORTH AND SO | ![]() REMOVAL OF OLD FENDERS (NORTH AND SO |
EPCC of CHEVRON’S PRAI TERMINAL SUBSEA DIESEL PIPELINE REPLACEMENT PROJECT
![]() Pipe lay utilization of pipe lay bar | ![]() Mid point tie in |
---|---|
![]() Alignment of stinges for 10”ø pipeli | ![]() Construction of Cofferdam (ON-GOING) |
![]() Construction of Cofferdam (ON-GOING) |