top of page

Photographs of Projects

FABRICATION WORKS

TANK FABRICATION AND MAINTENANCE

CIVIL CONSTRUCTION

MECHANICAL PIPING AND MAINTENANCE

SHORE APPROACH

POST TRENCHING

POST TRENCPIPELINE MISALIGNMENT RECTIFICATION WORKS AT SOGTHING

24” DIA. ANDRA / T-COT PIPELINE

ROCK LAYER PROTECTION PROJECT

Untitled

Untitled

Untitled

Untitled

B-COT PIPELINE ROCK LAYER PROTECTION PROJECT

Untitled

Untitled

Untitled

Untitled

KUMANG PIPELINE PROTECTION PROJECT

28” DIA. EVA-NMB GAS DELIVERY SYSTEM (ENGDS) PIPELINE PROTECTION WORKS

PULAU GAYA PIPELINE INSTALLATION

VINCI PROJECTS – REMOVAL OF SHEET PILE

ECA-EN RANGING & DEPERMING SYSTEM INSTALLATION

EPCC of CHEVRON’S PRAI TERMINAL - FENDER REPLACEMENT PROJECT

EPCC of CHEVRON’S PRAI TERMINAL - FENDER REPLACEMENT PROJECT

FENDERS JOINT INSPECTION WITH CHEVRO

FENDERS JOINT INSPECTION WITH CHEVRO

FENDERS JOINT INSPECTION WITH CHEVRO

FENDERS JOINT INSPECTION WITH CHEVRO

INSTALLATION OF FENDERS AND TOUCH UP

INSTALLATION OF FENDERS AND TOUCH UP

INSTALLATION OF FENDERS AND TOUCH UP

INSTALLATION OF FENDERS AND TOUCH UP

REMOVAL OF OLD FENDERS (NORTH AND SO

REMOVAL OF OLD FENDERS (NORTH AND SO

REMOVAL OF OLD FENDERS (NORTH AND SO

REMOVAL OF OLD FENDERS (NORTH AND SO

EPCC of CHEVRON’S PRAI TERMINAL SUBSEA DIESEL PIPELINE REPLACEMENT PROJECT

Pipe lay utilization of pipe lay bar

Pipe lay utilization of pipe lay bar

Mid point tie in

Mid point tie in

Alignment of stinges for 10”ø pipeli

Alignment of stinges for 10”ø pipeli

Construction of Cofferdam (ON-GOING)

Construction of Cofferdam (ON-GOING)

Construction of Cofferdam (ON-GOING)

Construction of Cofferdam (ON-GOING)

  • Facebook Square
bottom of page